Welcome and thank you for visiting our site! Today is:


Wayne Russell & Associates - Manufacturing Consultants, Cost Reduction, Waste Elimination Industrial Engineer Consulting Consultant  IE Lean Six Sigma Black Belt Cost Reduction Cost Savings Plant Layout Plant layout design  AutoCAD  Time Study  Work Measurement Work Instructions Time and Motion Studies  Line Balancing  Cell Design  Productivity Improvements  Methods Analysis  Value Stream Mapping Waste Elimination Muda  Labor Standards Setting  Time Study Training  Green Belt Training  Black Belt Training  Lean 2 Green Training  TIMWOOD Training  Profitability Improvement  Operations Assessment and Evaluation Services  Metrics Development  Interim Temp Contracting of Professional Services  Lean to Green  Lean2Green  Lean and Green  Lean2Green  Manpower Utilization Optimization  8 forms of waste  Lean Six Sigma  Capacity Planning  Toyota Production System  Thru put and Flow Improvements  Inventory Reduction  Supply Chain Management  Interim Engineers  Interim Professionals  Contract Work  Coaching and Mentoring Standardized Work  Facility Consolidations  Facility Planning  Project ManagementWayne Russell & Associates - Manufacturing Consultants, Cost Reduction, Waste Elimination Industrial Engineer Consulting Consultant  IE Lean Six Sigma Black Belt Cost Reduction Cost Savings Plant Layout Plant layout design  AutoCAD  Time Study  Work Measurement Work Instructions Time and Motion Studies  Line Balancing  Cell Design  Productivity Improvements  Methods Analysis  Value Stream Mapping Waste Elimination Muda  Labor Standards Setting  Time Study Training  Green Belt Training  Black Belt Training  Lean 2 Green Training  TIMWOOD Training  Profitability Improvement  Operations Assessment and Evaluation Services  Metrics Development  Interim Temp Contracting of Professional Services  Lean to Green  Lean2Green  Lean and Green  Lean2Green  Manpower Utilization Optimization  8 forms of waste  Lean Six Sigma  Capacity Planning  Toyota Production System  Thru put and Flow Improvements  Inventory Reduction  Supply Chain Management  Interim Engineers  Interim Professionals  Contract Work  Coaching and Mentoring Standardized Work  Facility Consolidations  Facility Planning  Project ManagementWayne Russell & Associates - Manufacturing Consultants, Cost Reduction, Waste Elimination Industrial Engineer Consulting Consultant  IE Lean Six Sigma Black Belt Cost Reduction Cost Savings Plant Layout Plant layout design  AutoCAD  Time Study  Work Measurement Work Instructions Time and Motion Studies  Line Balancing  Cell Design  Productivity Improvements  Methods Analysis  Value Stream Mapping Waste Elimination Muda  Labor Standards Setting  Time Study Training  Green Belt Training  Black Belt Training  Lean 2 Green Training  TIMWOOD Training  Profitability Improvement  Operations Assessment and Evaluation Services  Metrics Development  Interim Temp Contracting of Professional Services  Lean to Green  Lean2Green  Lean and Green  Lean2Green  Manpower Utilization Optimization  8 forms of waste  Lean Six Sigma  Capacity Planning  Toyota Production System  Thru put and Flow Improvements  Inventory Reduction  Supply Chain Management  Interim Engineers  Interim Professionals  Contract Work  Coaching and Mentoring Standardized Work  Facility Consolidations  Facility Planning  Project ManagementWayne Russell & Associates - Manufacturing Consultants, Cost Reduction, Waste Elimination Industrial Engineer Consulting Consultant  IE Lean Six Sigma Black Belt Cost Reduction Cost Savings Plant Layout Plant layout design  AutoCAD  Time Study  Work Measurement Work Instructions Time and Motion Studies  Line Balancing  Cell Design  Productivity Improvements  Methods Analysis  Value Stream Mapping Waste Elimination Muda  Labor Standards Setting  Time Study Training  Green Belt Training  Black Belt Training  Lean 2 Green Training  TIMWOOD Training  Profitability Improvement  Operations Assessment and Evaluation Services  Metrics Development  Interim Temp Contracting of Professional Services  Lean to Green  Lean2Green  Lean and Green  Lean2Green  Manpower Utilization Optimization  8 forms of waste  Lean Six Sigma  Capacity Planning  Toyota Production System  Thru put and Flow Improvements  Inventory Reduction  Supply Chain Management  Interim Engineers  Interim Professionals  Contract Work  Coaching and Mentoring Standardized Work  Facility Consolidations  Facility Planning  Project ManagementWayne Russell & Associates - Manufacturing Consultants, Cost Reduction, Waste Elimination Industrial Engineer Consulting Consultant  IE Lean Six Sigma Black Belt Cost Reduction Cost Savings Plant Layout Plant layout design  AutoCAD  Time Study  Work Measurement Work Instructions Time and Motion Studies  Line Balancing  Cell Design  Productivity Improvements  Methods Analysis  Value Stream Mapping Waste Elimination Muda  Labor Standards Setting  Time Study Training  Green Belt Training  Black Belt Training  Lean 2 Green Training  TIMWOOD Training  Profitability Improvement  Operations Assessment and Evaluation Services  Metrics Development  Interim Temp Contracting of Professional Services  Lean to Green  Lean2Green  Lean and Green  Lean2Green  Manpower Utilization Optimization  8 forms of waste  Lean Six Sigma  Capacity Planning  Toyota Production System  Thru put and Flow Improvements  Inventory Reduction  Supply Chain Management  Interim Engineers  Interim Professionals  Contract Work  Coaching and Mentoring Standardized Work  Facility Consolidations  Facility Planning  Project ManagementWayne Russell & Associates - Manufacturing Consultants, Cost Reduction, Waste Elimination Industrial Engineer Consulting Consultant  IE Lean Six Sigma Black Belt Cost Reduction Cost Savings Plant Layout Plant layout design  AutoCAD  Time Study  Work Measurement Work Instructions Time and Motion Studies  Line Balancing  Cell Design  Productivity Improvements  Methods Analysis  Value Stream Mapping Waste Elimination Muda  Labor Standards Setting  Time Study Training  Green Belt Training  Black Belt Training  Lean 2 Green Training  TIMWOOD Training  Profitability Improvement  Operations Assessment and Evaluation Services  Metrics Development  Interim Temp Contracting of Professional Services  Lean to Green  Lean2Green  Lean and Green  Lean2Green  Manpower Utilization Optimization  8 forms of waste  Lean Six Sigma  Capacity Planning  Toyota Production System  Thru put and Flow Improvements  Inventory Reduction  Supply Chain Management  Interim Engineers  Interim Professionals  Contract Work  Coaching and Mentoring Standardized Work  Facility Consolidations  Facility Planning  Project ManagementWayne Russell & Associates - Manufacturing Consultants, Cost Reduction, Waste Elimination Industrial Engineer Consulting Consultant  IE Lean Six Sigma Black Belt Cost Reduction Cost Savings Plant Layout Plant layout design  AutoCAD  Time Study  Work Measurement Work Instructions Time and Motion Studies  Line Balancing  Cell Design  Productivity Improvements  Methods Analysis  Value Stream Mapping Waste Elimination Muda  Labor Standards Setting  Time Study Training  Green Belt Training  Black Belt Training  Lean 2 Green Training  TIMWOOD Training  Profitability Improvement  Operations Assessment and Evaluation Services  Metrics Development  Interim Temp Contracting of Professional Services  Lean to Green  Lean2Green  Lean and Green  Lean2Green  Manpower Utilization Optimization  8 forms of waste  Lean Six Sigma  Capacity Planning  Toyota Production System  Thru put and Flow Improvements  Inventory Reduction  Supply Chain Management  Interim Engineers  Interim Professionals  Contract Work  Coaching and Mentoring Standardized Work  Facility Consolidations  Facility Planning  Project ManagementWayne Russell & Associates - Manufacturing Consultants, Cost Reduction, Waste Elimination Industrial Engineer Consulting Consultant  IE Lean Six Sigma Black Belt Cost Reduction Cost Savings Plant Layout Plant layout design  AutoCAD  Time Study  Work Measurement Work Instructions Time and Motion Studies  Line Balancing  Cell Design  Productivity Improvements  Methods Analysis  Value Stream Mapping Waste Elimination Muda  Labor Standards Setting  Time Study Training  Green Belt Training  Black Belt Training  Lean 2 Green Training  TIMWOOD Training  Profitability Improvement  Operations Assessment and Evaluation Services  Metrics Development  Interim Temp Contracting of Professional Services  Lean to Green  Lean2Green  Lean and Green  Lean2Green  Manpower Utilization Optimization  8 forms of waste  Lean Six Sigma  Capacity Planning  Toyota Production System  Thru put and Flow Improvements  Inventory Reduction  Supply Chain Management  Interim Engineers  Interim Professionals  Contract Work  Coaching and Mentoring Standardized Work  Facility Consolidations  Facility Planning  Project ManagementWayne Russell & Associates - Manufacturing Consultants, Cost Reduction, Waste Elimination Industrial Engineer Consulting Consultant  IE Lean Six Sigma Black Belt Cost Reduction Cost Savings Plant Layout Plant layout design  AutoCAD  Time Study  Work Measurement Work Instructions Time and Motion Studies  Line Balancing  Cell Design  Productivity Improvements  Methods Analysis  Value Stream Mapping Waste Elimination Muda  Labor Standards Setting  Time Study Training  Green Belt Training  Black Belt Training  Lean 2 Green Training  TIMWOOD Training  Profitability Improvement  Operations Assessment and Evaluation Services  Metrics Development  Interim Temp Contracting of Professional Services  Lean to Green  Lean2Green  Lean and Green  Lean2Green  Manpower Utilization Optimization  8 forms of waste  Lean Six Sigma  Capacity Planning  Toyota Production System  Thru put and Flow Improvements  Inventory Reduction  Supply Chain Management  Interim Engineers  Interim Professionals  Contract Work  Coaching and Mentoring Standardized Work  Facility Consolidations  Facility Planning  Project ManagementWayne Russell & Associates - Manufacturing Consultants, Cost Reduction, Waste Elimination Industrial Engineer Consulting Consultant  IE Lean Six Sigma Black Belt Cost Reduction Cost Savings Plant Layout Plant layout design  AutoCAD  Time Study  Work Measurement Work Instructions Time and Motion Studies  Line Balancing  Cell Design  Productivity Improvements  Methods Analysis  Value Stream Mapping Waste Elimination Muda  Labor Standards Setting  Time Study Training  Green Belt Training  Black Belt Training  Lean 2 Green Training  TIMWOOD Training  Profitability Improvement  Operations Assessment and Evaluation Services  Metrics Development  Interim Temp Contracting of Professional Services  Lean to Green  Lean2Green  Lean and Green  Lean2Green  Manpower Utilization Optimization  8 forms of waste  Lean Six Sigma  Capacity Planning  Toyota Production System  Thru put and Flow Improvements  Inventory Reduction  Supply Chain Management  Interim Engineers  Interim Professionals  Contract Work  Coaching and Mentoring Standardized Work  Facility Consolidations  Facility Planning  Project Management

Wayne Russell & Associates - Manufacturing Consultants, Cost Reduction, Waste Elimination Industrial Engineer Consulting Consultant  IE Lean Six Sigma Black Belt Cost Reduction Cost Savings Plant Layout Plant layout design  AutoCAD  Time Study  Work Measurement Work Instructions Time and Motion Studies  Line Balancing  Cell Design  Productivity Improvements  Methods Analysis  Value Stream Mapping Waste Elimination Muda  Labor Standards Setting  Time Study Training  Green Belt Training  Black Belt Training  Lean 2 Green Training  TIMWOOD Training  Profitability Improvement  Operations Assessment and Evaluation Services  Metrics Development  Interim Temp Contracting of Professional Services  Lean to Green  Lean2Green  Lean and Green  Lean2Green  Manpower Utilization Optimization  8 forms of waste  Lean Six Sigma  Capacity Planning  Toyota Production System  Thru put and Flow Improvements  Inventory Reduction  Supply Chain Management  Interim Engineers  Interim Professionals  Contract Work  Coaching and Mentoring Standardized Work  Facility Consolidations  Facility Planning  Project Management
Wayne Russell & Associates - Manufacturing Consultants, Cost Reduction, Waste EliminationIndustrial Engineer Consulting Consultant  IE Lean Six Sigma Black Belt Cost Reduction Cost Savings Plant Layout Plant layout design  AutoCAD  Time Study  Work Measurement Work Instructions Time and Motion Studies  Line Balancing  Cell Design  Productivity Improvements  Methods Analysis  Value Stream Mapping Waste Elimination Muda  Labor Standards Setting  Time Study Training  Green Belt Training  Black Belt Training  Lean 2 Green Training  TIMWOOD Training  Profitability Improvement  Operations Assessment and Evaluation Services  Metrics Development  Interim Temp Contracting of Professional Services  Lean to Green  Lean2Green  Lean and Green  Lean2Green  Manpower Utilization Optimization  8 forms of waste  Lean Six Sigma  Capacity Planning  Toyota Production System  Thru put and Flow Improvements  Inventory Reduction  Supply Chain Management  Interim Engineers  Interim Professionals  Contract Work  Coaching and Mentoring Standardized Work  Facility Consolidations  Facility Planning  Project Management

 

 

Wayne Russell & Associates are hands-on Productivity Consultants to the Manufacturing, Services and Healthcare industries. Our mission is to provide professional, high quality and high energy consulting services implementing operational improvements that result in immediate and long term savings and benefits which exceed the client’s expectations.

In addition to being Lean Six Sigma Black Belts, our expertise and core competency is Industrial Engineering, Lean Implementation and Continuous Improvement with a very strong emphasis on Cost Reduction and Waste Elimination.

In addition we offer a full range of related and complementary services which include:

 

• Lean Implementation and Training
• Value Stream Mapping
• Plant Layout Design
• Facility Consolidations / Relocations / Startups
• Manufacturing Cell Design
• Project Management
• Manpower Utilization
• Capacity Planning
• Thru-put and Flow Improvement
• Productivity Improvement
• Profitability Improvement
• Operations Assessment and Evaluation Services
• Metrics Development
• Interim/Temp/Contracting of Professional Services
• Supply Chain and Inventory Management
• Inventory Reduction
• Lean 2 Green Implementation and Training
• Time and Motion Studies
• Line Balancing
• Methods Analysis
• Work Instructions
• Time Study Training
• Continuous Improvement

• And Much More

 

Service Disabled Veteran Small Business Affiliate 

 

Home - Services Offered - Industries Served - Operations & Processes
Results - References - Our Team - Lean 2 Green - White Papers - Healthcare - Contact Us

© 2010 - Wayne Russell & Associates, llc