| RESULTS |
||
|
|
The following are a few examples of actual client results provide during an engagement. |
-------------------------------------------------- |
CASE
ONE: 532% ROI |
|
532% First Years Return on Investment. |
|
Designed and implemented the progressive Line-Flow method of sanding, prepping and painting motorhomes. |
|
Identified and solved major bottleneck in the coach painting process thereby increasing quality and thru-put, decreasing WIP and overtime | |
|
Identified and eliminated the over-use and wasting of expensive clearcoat, sealer and vinyl wash. | |
-------------------------------------------------- |
||
CASE
TWO: 277% ROI |
|
277% First Years Return on Investment. |
|
Time studied and optimized manufacturing cells by balancing the work between operators, increased the machine speeds and increased cell output. | |
|
Identified and eliminated wasteful/unnecessary work and improved the workplace methods. | |
|
Trained all supervisors in Time Study which included classroom and shop floor proof of proficiency in doing a time study, checking and verifying machine cycle times and standard methods | |
-------------------------------------------------- |
||
CASE THREE: RV Manufacturer
261% ROI |
||
|
261%
First Years Return on Investment. |
|
|
Eliminated unnecessary Overtime. | |
|
Implemented techniques to reuse and to reduce the wasting of very expensive raw materials. | |
|
Designed and implemented the first Lean manufacturing cells in the Cabinet Shop. |
-------------------------------------------------- |
During virtually every engagement there are associated tasks that are performed as a service by us that may not directly result in bottom line savings but are a necessary or a convenient relief to further help the client progress. Some examples would be: |
|
Review resumes and assist in the interview and selection process when hiring Industrial Engineers or other technical employees. |
|
Working with vendors to negotiate lower prices on essential and usually expensive raw materials. |
|
Special project management, planning and cost tracking. | |
|
Identifying problem employees or managers who are found to be serious hindrances or roadblocks to progress or change or in some cases unscrupulous activities or practices. | |
-------------------------------------------------- |
||
| In addition, the following are the highly publicized TYPICAL RESULTS of implementing Lean in virtually any environment: | ||
|
Reduction in floor space requirements | |
|
Reduction of lead time | |
|
Reduction of inventory | |
|
Reduction of scrap/defects/waste/errors | |
|
Reduction of labor costs | |
|
Reduction of operating costs | |
|
Increase in capacity | |
|
Increase in productivity | |
|
Increase in quality | |
|
And much more | |
|